Get in Touch

Posts Tagged ‘bridge’

Bridge Fitted

Tuesday, February 8th, 2011

Dr Capan fitted Mrs’s B’s bridge today and the result was stunning

Crown Preparation

Monday, October 18th, 2010

Mrs S attanded today for preparation of her upper bridge and veneers today. The preparation was followed by various impressions of her teeth and she was then fitted with beautiful temporaries. She will return in a couple of weeks for her final, porcelain bridge and veneers

Veneers are Fitted

Thursday, August 12th, 2010

Mrs L came today to have her upper porcelain work fitted. It was a combination of porcelain crowns and a bridge on 12 teeth and the final result looked amazing

Bridge Fit

Tuesday, August 10th, 2010

Today I fitted Mrs V with her 3 unit porcelain bridge to replace a missing tooth. A bridge is a very good option to replace a missing tooth if the teeth either side of the gap are filled. The bridge looked absolutely stunning and Mrs V left smiling.

Upper Veneers & Bridge Are Fitted

Tuesday, August 3rd, 2010

Mr A attended today to have his upper veneers and bridge fitted. He was here for less than 2 hours and left with his fantastic new smile

Bridge Preparation for Lost Tooth

Monday, July 26th, 2010

Mrs J had the preparation for a bridge to replace her missing tooth. A bridge is a good long-term option to replace a missing tooth, other options are dental implants or dentures. Mrs J will wear a temporary bridge while my technician makes her porcelain bridge, this usually takes 2-3 weeks

Veneer Smile

Friday, July 16th, 2010

Today I created a new smile for Mr A. I prepared his upper teeth and fitted him with beautiful temporary veneers which he will wear for 2-3 weeks while the laboratory make his new porcelain veneers and bridge

Happy patients

Monday, June 28th, 2010

This morning Mrs L attended for crown and bridge preparation of 12 upper teeth. She was nervous about having the treatment but three hours later left smiling with her stunning temporary bridge and crowns in place. She will have hew permanent work fitted in 2-3 weeks time.